[1]
Sin, T.S. and Dede, T. 2024. A Review for the Multi-Objective Optimization of Time-Cost-Risk Trade-off in Construction. ISERDAR. 2, 3 (Dec. 2024), 54–63. DOI:https://doi.org/10.5281/zenodo.14515089.